Bluechip closed Dec 19 - Jan 12 | Reopening 6am Jan 12
Our Services
E&I Construction and Industrial Services
Industrial Coatings
Industrial Fabrication
Industrial Switchboards
Maintenance & Machine Refurbishment
Structural Mechanical Piping (SMP)
Offsite Modularisation
About Us
News & Insights
Case Studies
Careers
Contact Us
Insights
Latest Case Studies
See our latest work with our case studies.
Case Study
BlueLogic - Robe Valley Mesa J PP2 NPI Switchboard Package
A comprehensive $600,000 NPI electrical package was constructed, tested and delivered for the Robe Valley Mesa project to Rio Tinto specifications. The scope included outlet boxes, control panels, marshalling boxes, distribution boards and motor control panels, including custom-fabricated 316 stainless steel IP66 assemblies. The project demonstrates the specialist industrial electrical expertise and quality-led project delivery that Corey Turner now brings to BlueLogic.
John Doe
May 28, 2026
View all
Industry Insights
Case Studies
Service Updates
Expert Opinions
Case Study
BlueLogic - Motor Starter Panels
Four 690VAC Motor Starter Panels were constructed, tested and delivered for a major North American oil and gas contractor. Designed for demanding offshore environments, the panels feature robust 2mm 316 stainless steel construction and IP66 certification for long-term durability and reliable performance in harsh operating conditions. The $200,000 project demonstrates the specialist industrial electrical expertise that Corey Turner now brings to BlueLogic.
June 30, 2026
Case Study
CBH - Master Goods Agreement
BIS has been engaged under a 5 year Master Goods Agreement to support CBH Group with their network upgrade. Our service includes structural, mechanical, electrical and hydraulic works.
January 10, 2025
Case Study
CBH Kwinana Grain Terminal – Major Shutdown Works
Bluechip is engaged by CBH Group to scan, engineer, design, shop detail, fabricate and install various critical ducting during a 10-day shutdown in September 2024.
January 7, 2025
Case Study
CBH Cranbrook Rail Outloading Facility
In late 2025, Bluechip Industrial Services was engaged by CBH Group to deliver a multidisciplinary package of works for a Rail Outloading Facility within an active rail corridor. The project involved coordinating several disciplines within a live operational environment, requiring strict adherence to rail safety requirements and controlled access conditions.
May 5, 2026
Case Study
BlueCoatings: Built to last for CBH, proven at every coat
BlueCoatings completed surface preparation, protective coating and quality assurance for the BIS1439 DOG Stacker project as part of Bluechip Industrial Services’ ongoing supply to CBH Group. Covering 52 drawings and multiple batches of structural and mechanical components, every item was blasted, coated, inspected and documented to CBH specifications. The result was a comprehensive 101-page quality dossier, providing full traceability and demonstrating BlueCoatings’ capability to deliver high-volume protective coating work with consistent quality from preparation through to final sign-off.
September 21, 2026
Case Study
BlueLogic - Salmon Gums Site Main Switchboard
BlueLogic designed, constructed, tested and delivered a new 1000A Site Main Switchboard for the Salmon Gums commercial site. Manufactured entirely in-house, the $200,000 project incorporates multiple supply incomers, UPS backup, arc fault containment and provision for future solar integration - showcasing BlueLogic’s engineering expertise and ability to deliver fully compliant, future-ready industrial electrical solutions.
July 31, 2026
Case Study
BlueLogic - Switchboard Package
BlueLogic successfully delivered 15 complete Drive Over Grid (DOG) Stacker switchboard packages for CBH Group, demonstrating its capability in custom industrial electrical solutions. Featuring marine-grade aluminium construction, integrated machine safety systems and programmable smart relay controls, the $1 million project was delivered through a staged manufacturing and testing process to ensure quality, consistency and on-time completion.
August 31, 2026
Case Study
CBH Kwinana Grain Terminal Platform
Bluechip Industrial Services has been engaged by CBH Group to survey, design, engineer, fabricate, surface treat and install 1 x critical shutdown platform.
January 7, 2025
Case Study
Covalent Lithium Steelworks
Bluechip Industrial Services has been engaged by Genus for the shop detailing, supply, fabrication, assembly, delivery and installation of Covalent Lithium switch room structural steel.
January 7, 2025
Case Study
CBH MLS Refurbishments
Bluechip was engaged by CBH Group under an MGA to perform major overhaul and compliance improvement works on 2 x MLS Loaders
January 10, 2025
Case Study
CBH Harvest 2023
BIS was awarded multiple packages of work for CBH Harvest 2023, including supply, fabrication, mechanical and electrical works and the assembly of over 4km of conveyors.
January 7, 2025
Case Study
CBH Dog Stackers
Bluechip was engaged by CBH Group under an MGA to supply, fabricate, assemble, deliver and site commission 5 x Drive Over Grids and 5 x Conveyor Loading Stackers.
January 7, 2025
Case Study
Cosmos Restart Project
Bluechip Industrial Services has been engaged to shop detail, supply, fabricate, rubber line and surface treat various platework packages consisting of chutes, hoppers, bins and general process pipework.
January 7, 2025
Case Study
FMG NSJ Platform Steelworks
Bluechip Industrial Services has been engaged to shop detail, supply, fabricate, surface treat and install 28 x Substation Platforms.
January 7, 2025
Case Study
CBH 2024 CLS Stackers
Bluechip was engaged by CBH Group under an MGA to supply, fabricate, assemble, deliver and site commission 18 x Conveyor Loading Stackers.
January 7, 2025
Case Study
CBH 2024 Conveyor Equipment
Bluechip was engaged by CBH Group under an MGA to supply, fabricate, assemble and deliver various equipment.
January 7, 2025
Case Study
FMG T155 Solomon Scrubbing Screen Monorails
Bluechip was engaged by FMG to supply, fabricate, assemble and deliver various Monorails steelwork to facilitate a major shutdown.
January 7, 2025
Case Study
West Musgrave – Cast-In Steelwork
Bluechip was engaged by Melchor to shop detail, supply, fabricate and surface treat packages of HDG cast-in steelworks.
January 7, 2025
Case Study
CBH Switchboards, SMSB and MCC’s
Bluechip is engaged by CBH Group to manufacture, assemble, build and test over 21 switchboards including SMSB and MCCs.
January 7, 2025
Case Study
Collie BESS Structural Steel
Bluechip has been awarded the shop detailing, supply, manufacture, surface treatment, assembly and installation of 250t of substation steelwork, including special welded beams.
January 7, 2025
Case Study
Fabrication and assembly for CBH Group
Bluechip recently completed a major fabrication and assembly project for CBH Group. Additional laydown space at our Henderson location proved ideal for the work.
November 15, 2024
Get In Touch
We’re here to assist you with your enquiries.
tenders@bisau.com.au
(08) 9419 2205
Bluechip Industrial Services & Head Office
39 Success Way, Henderson WA 6166
BlueLogic Industrial Switchboards
71 Wattleup Road, Wattleup WA 6166
BlueCoatings Industrial Protection
71 Wattleup Road, Wattleup WA 6166
First Name
Last Name
Email
Phone Number
Message
Agree to
Terms
Thank you! We’ll get back to you shortly.
Oops! There was an error with your submission.